Replacing a tired bathroom is one of the most popular home jobs in Tyne and Wear, but the prices quoted online can swing wildly. This guide breaks down what you actually pay for the suite, the fitting and the bits people forget, so you can budget with confidence before anyone lifts a spanner.
A bathroom suite usually means the toilet, basin and bath (or shower tray and enclosure). The suite alone is often the cheapest part of the project. The bigger cost is everything around it: removal of the old fittings, plumbing changes, tiling, flooring, electrics and making good.
As a rough guide for the North East, a basic white suite costs around 350 to 700 pounds in materials. A mid range suite with a decent shower, taps and a vanity unit typically lands between 900 and 2,000 pounds. Premium ranges climb well beyond that.
Labour is usually the largest single line on the quote. A typical bathroom refit in Newcastle takes one fitter around five to eight working days, longer if the room is being reconfigured or you hit problems behind the walls.
Day rates vary, but expect plumbing and fitting to sit somewhere around 200 to 280 pounds a day locally. Tiling is often priced separately by the square metre, and a qualified electrician is needed for any new lighting, extractor fan or shower circuit.
The headline suite price rarely includes the things that make the room work. These are easy to overlook when you are comparing showroom tickets, and they add up quickly.
Older properties around Newcastle, Gateshead and the coast often have lead or steel pipework, solid walls or awkward soil pipe runs. Discovering these mid job is the most common reason a quote moves, so a proper survey first is worth its weight.
The single biggest saving is keeping the existing layout. Moving the toilet or bath means new waste and supply runs, which adds days of labour and often floor lifting. Staying put can save hundreds of pounds.
Choosing standard sized fittings, sticking to one tiled feature wall rather than floor to ceiling everywhere, and ordering all materials before work starts will all reduce both cost and delays. Always get a written, itemised quote rather than a single lump sum so you can see exactly what is and is not included.
Most standard refits take five to eight working days. Allow longer if you are changing the layout, replacing old pipework or waiting on plaster and tiles to dry.
You can, and it sometimes saves a little, but you take on responsibility if anything is damaged, wrong or missing. Many fitters get trade prices and will handle returns, so it is worth comparing both routes.
Cheaper quotes often exclude tiling, waste removal, electrics or making good, or assume no surprises behind the walls. Always check what each quote covers before comparing the totals.